D3 8-inch Stone Wall with Removable Segment

Photo Aug 31, 10 48 25 PM
Insert vertical end posts into the base plate.
Photo Aug 31, 10 48 52 PM
Insert wall segments as shown above. (You can rotate and rearrange these segments if you are assembling multiple walls)
Photo Aug 31, 10 49 51 PM
Glue asymmetrical corner pieces into the 4 slots closest to the center.
Photo Aug 31, 10 50 18 PM
Glue wide corner strips into the 4 slots closer to the ends of the base plate.
Photo Aug 31, 10 50 38 PM
Glue the top plate down to the op of the vertical wall segments.
Photo Aug 31, 10 50 57 PM
Glue removable wall center into the removable top plate.
Photo Aug 31, 10 51 18 PM
Glue the detail plates into both side of the removable wall panel.
Photo Aug 31, 10 51 41 PM
Insert but DO NOT GLUE the removable segment into the slot in the top of the wall.

 

Leave a Reply

Your email address will not be published. Required fields are marked *


Thanks!


© 2022 Death Ray Designs LLC.  All Rights Reserved.